What the process says versus what actually happens.
One visual. One minute.

Gate pass raised with material details, value, and supporting documents

Gate pass raised. Documents? "Will attach later."

System routes to correct approver based on material type and value.



Truck is waiting. Guard calls approver directly.

Approver reviews within authority limit. If unavailable, routes to defined delegate.

Approver is in a meeting. Verbal okay over phone.

Approval received with timestamp before material moves.


Material leaves. Timestamp: 10:14 AM.

Material dispatched after approval. Gate pass closed with confirmation.

Approver opens system after lunch. Approves.
Timestamp: 2:47 PM.



Material value exceeds this approver's authority limit. Second-level approval needed. Never obtained.

Documents attached two days later. PO number doesn't match. Nobody checks.

TRUSTED CLIENTS
If even one of the 10 fails on any of these three checks, your approval process has gaps your system is not catching.
GET STARTED

Three rules. If all three are enforced by the system - not by memory, not by discipline, but by the system - your approval process is audit-proof. If any one is optional, it will eventually be skipped.