Buying PTW Software? 8 Things to Check | TouchPoint
4.7/5 Rating on Capterra
ISO 27001, CSA STAR, DPDPA
TouchPoint Gate

Buying PTW Software?
8 Things to Check Before You Shortlist

Most PTW software looks the same in a demo. A form opens, someone approves it on a phone, and a PDF comes out at the end.

That isn't the real test. The real test is a live site: a permit expires halfway through the job, two crews are working in the same area, a contractor reaches the gate with an expired permit, or an auditor asks for six months of hot work records.

4.7/5 Rating on Capterra
st-cer

TouchPoint Control Of Work

Request to closure, gate-linked, evidenced at every step. We're the gate as well as the permit.

350+ Enterprise Customers Across All Products
Checklist

Check These Eight Before You Shortlist.

Evaluate how a PTW platform performs on a live site — not just in a scripted demo.

01

Built around IS 17893:2023

Every permit follows the full statutory lifecycle — request, hazard review, isolation, authorization, active monitoring, and formal closure.

IS 17893:2023 compliant work permit lifecycleNo-code configurable permit types, checklists and approval levelsFull context dashboard before permit approvalSecurity gate integrated with Visitor Management SystemMobile permit checklist, photo evidence and signature at job siteEquipment hold status with mandatory supervisor re-verificationAI anomaly detection flagging missed safety compliance itemsMulti-site PTW governance from one central platform

Red flag: Permits end by timing out instead of requiring verified physical closure.

Get Started

How TouchPoint Measures Up

IS 17893 Lifecycle Built In.

Configurable without code. A context panel for approvers. Native VMS integration. Full mobility. Hold escalation. AI flagging. Multi-site from day one.