Industrial Permit to Work Software | Control of Work | TouchPoint
TouchPoint Gate

Hot Work In One Bay.
Confined Space In The Next.
Who's Tracking Both?

Manage high-risk industrial maintenance and contractor operations with digital permits, automated LOTO & gas test verification, gate-linked access enforcement, and tamper-proof audit trails.

4.7/5 Rating on Capterra
st-cer
Hot Work Permit HW-4587
350+ Enterprise Customers Across All Products
The Problem

The Plant Runs On Trust. The Permit Should Not.

Paper permits and disconnected approvals leave critical blind spots between the control room, the gate, and the shop floor.

You can't see what's open.

Permits live on paper in the plant. Nobody has a live picture.

Nobody checks what was ticked.

Controls are declared at a desk and never verified at the job.

You don't know who's inside.

An emergency, and you're counting heads on a whiteboard.

Permits don't close.
They expire.

Isolations left in place, areas not restored, no handback.

The plant has no memory.

The same contractor repeats the same violation every month and nothing connects it.

Security & Compliance

Enterprise-Grade Security,
Privacy & Compliance.

Everything runs on a platform built for enterprise trust: ISO 27001 and CSA STAR certified, with data handling built ground-up for India's DPDPA - the standard your compliance team will actually approve of.

Security Certificates
Get Started

Ready To Replace Paper Permits
With Provable Control?

Schedule a personalized walkthrough using your plant's actual permit workflows, checklists, and gate rules.

See It On Your Own Permits

Permit Types

Every Permit Type, With The Checklist That Belongs To It

Pick the type. The checklist builds itself.

Each type also carries its required competencies. A worker without them can't be named on the permit - the check runs at assignment, not at the gate.

Hot Work Checklist
The Differentiators

What Only TouchPoint Does

Three capabilities that turn a permit from a signed piece of paper into live, gate-enforced operational control.

No More Blind Approvals

Your approver doesn't know this contractor raised four non-conformances last month, or that one of the men named on the permit has an expired medical.

The Decision Context Panel puts the contractor's safety scorecard, every worker's competency status, the risk summary and the area's recent history on the same screen as the approve button - auto-populated, nothing to compile.

TouchPoint Decision Context Panel and Permit Approval Interface

The Gate Knows Before the Worker Arrives

A signed permit is useless if an unauthorized contractor can still walk past security onto the shop floor. TouchPoint directly synchronizes permit status with physical turnstiles and gates.

If a worker's medical clearance has expired, safety induction is incomplete, or permit validity has lapsed, access is automatically blocked at the gate. Zero reliance on security guards memorizing paperwork.

Turnstile Gate Enforcement and Worker Verification
Enforcement

Immutable, Tamper-Proof Audit Trails

When an incident occurs or safety auditors arrive, spreadsheets and paper checklists cannot withstand scrutiny. Regulators require forensic, unalterable proof of who authorized each phase and when.

Every permit approval, gas test reading, lockout verification, and gate entry is cryptographically stamped with identity and synchronized time. No record can be edited, deleted, or backdated.

Forensic Audit Trail and Activity Log
Evidenced
Live Operations

What's Live In Your Plant Right Now

One screen. Every active permit, every work area, workers currently inside, countdown to expiry.

Hold

Hold

Temporary pause. PPE, tool, weather, site condition.

Suspend

Suspend

Serious. Work doesn't resume without the Safety Officer.

Cancel

Cancel

Terminated, reason recorded.

Rising holds at one location tells you discipline is slipping -
months before it becomes an incident.

AlertPermit expires with workers still inside → immediate alert.
Live Plant Operations Console
Closure

Most Permits Are Never Closed. They Expire.

An expired permit is not a safe handover. TouchPoint enforces verified worker exit, isolation removal, and maker-checker sign-off before any permit is closed.

Worker Exit Cross-Checked Against Gate Records - We Don't Ask, We Check

Isolation Removal Confirmed Point By Point, Where Isolation Was Declared

Maker-Checker Enforced - Whoever Initiates Closure Can Never Verify It

Auto-Generated Permit Closure Certificate, Digitally Signed. Nobody Compiles It

Permit Closure Handback Certificate Workflow
Adoption Strip

Built To Be Faster Than Paper,
Or The Plant Won't Use It

Designed for engineers, supervisors, and guards on the plant floor—removing friction so safety compliance happens in seconds, not hours.

Approvals from a phone
Gate clears compliant workers in seconds
Checklists pre-fill
Contractors upload their own documents
Certificates generate themselves

One permit standard across every plant. Same contractor, same record, wherever he works.

Built To Be Faster Than Paper Mobile App
IS 17893:2023

Built To India's
Permit To Work Standard

BIS published IS 17893 in 2023 - the first Indian standard written specifically for permit to work systems. TouchPoint was engineered around it from the start, not mapped to it afterwards.

What IS 17893:2023 requires - a plain-English guide

IS 17893 Built to India's Permit to Work Standard
FAQ’s

Frequently
Asked Questions

Everything you need to know about industrial control of work, IS 17893 compliance, and plant turnstile integration.

What is an Industrial Permit to Work (PTW) system?

How does TouchPoint align with IS 17893:2023?

Can it integrate with our existing plant turnstiles and biometric gates?

How does the AI site video verification work?

How does TouchPoint prevent permits from expiring without formal closure?